+
  • 未标题-0.jpg
  • 未标题-1(4).jpg

A factory in Zhangjiagang – Side Panel Line and Lower Panel Line


Keyword:

Case Details

  The Great Wall Beam Project includes side and lower-body assembly, as well as the main welding commissioning area, with a total of 365 robots and 30 PLC systems, supporting a flexible production line for three vehicle models.

Related Cases

Leave a Message Online